Automatic Voltage Regulation at SS 110/35/10kV Valandovo

Preparation of design documentation, procurement and replacement of part of the primary equipment (CTs and VTs), adaptation of secondary connections, testing and commissioning of one 10kV transformer bay and one 35kV transformer bay, cable routing from bay to transformer and to AVR cabinet, installation and commissioning of AVR cabinet, connection of existing local signaling to the new AVR cabinet.

Contracting Authority: EVN Macedonia AD Skopje

Address: Lazar Lichenoski St. No.11, 1000 Skopje

Year: 2021