Preparation of design documentation, procurement, equipping and primary adaptation of secondary equipment for one feeder bay; adaptation of secondary equipment and preparation for remote control of twelve 10kV bays and five 35kV bays; complete cable connection from bays to control system, protection cabinets and AC/DC distribution; testing and commissioning; installation, testing and commissioning of three control system cabinets.

Contracting Authority: EVN Macedonia AD Skopje

Address: Lazar Lichenoski St. No.11, 1000 Skopje

Year: 2021