Preparation of design documentation, procurement and replacement of part of the primary equipment (combined 110kV measuring transformers), installation, modification and connection of protection, control, SCADA and AC/DC distribution cabinets, production of new metering cabinets and voltage branch cabinets, cable laying from 110kV bays to control room cabinets, testing and commissioning of 110kV bays.
Contracting Authority: AD MEPSO Skopje
Address: Maksim Gorki St. No.4
Equipment:
Year: 2021 – 2023