Replacement of 110kV Disconnectors at SS Zapad Benning-PSAM May 16, 2026 Energy 0 Comments Preparation of design documentation, replacement of 110kV disconnectors, installation and commissioning.Contracting Authority: EVN Macedonia AD SkopjeAddress: 11 Oktomvri St. No.9, SkopjeYear: 2019 You Might Also Like Preparation for Remote Control at SS Sever May 16, 2026 Reconstruction of 10kV Bays at SS 35/10kV “Vrutok” May 17, 2026 Electrical Installation Works for Conversion of 35kV Metering Bay N06 into Feeder Bay at SS 35/10 kV Shtip May 29, 2026 Leave a Reply Cancel reply