Preparation of project documentation for reconstruction of 110 kV plant
Electrical documentation design for reconstruction of a 110kV transmission and distribution substation SS 110/35/10kV Gazi Baba, Skopje, for both transformer and line bays. The project covers designing of protection and control cabinets, AVR cabinets, cabinets for local and remote signalization, AC/DC supply cabinets and all the necessary cabling connections
2017, EVN Macedonia AD Skopje