Our successfull stories:
SS 35/10kV Izvor, Kicevo
Electrical installation and construction works for complete reconstruction of SS 35/10kV Izvor, Kicevo Project for revitalization SS 35/10 kV Mariovo. The project includes civil works
SS 110/10KV Bitola 4
Electro-assembly works for equipping the second 110 kV transformer field and equipping 10 KV cells in SS 110 / 10KV Bitola 4 Equipping one 110
TS 110/35/10-Gazi Baba
Preparation of project documentation for reconstruction of 110 kV plant Electrical documentation design for reconstruction of a 110kV transmission and distribution substation SS 110/35/10kV Gazi
SS 110/20/10kV West
Dismantling, assembly, primary and secondary connection of two 110 kV disconnectors in SS 110/35/10kV West Project design, and implementation of Replacement of the disconnectors on
SS 110/20/10 kV Tearce
Delivery of a measuring cabinet for 110 kV transformer field in TS 110/20/10 kV Tearce Design, and assembly and putting into operation of Measuring cabinet
SS 20/10kV Vojnik
Reconstruction of 20 kV and 10 kV cells, relay protection and preparation for remote control in SS 20 / 10kV Vojnik, Kumanovo Electrical installation work